The following requirements shall be met as set forth below:
A. The DEVELOPER shall consult FLOODPLAIN engineering studies done for Marshall Township in order to delineate FLOODPLAIN areas within the proposed SUBDIVISION or LAND DEVELOPMENT tract.
B. With the exception of a privately developed water body or WATERCOURSE, proposed SUBDIVISION or LAND DEVELOPMENT tracts which include rivers, lakes, STREAMS or other significant WATERCOURSES or bodies of water shall adhere to the requirements of the Township FLOODPLAIN District requirements.