A. The first step in the determination of the site capacity is to establish the base site area. If site capacity analysis is required, the following calculations shall be submitted:
|
|
Acres | |
|
2. Subtract land constituting existing or future street right-of-ways, easement of access, or area set aside for public or private utilities, stormwater facilities and easements: |
|
Acres |
|
3. Subtract land which is not contiguous: (a) A separate parcel which does not abut, adjoin or share common boundaries with the rest of the development: |
|
Acres |
|
(b) Land which is cut off from the main parcel by a road, railroad, existing land uses or major stream so that common use is hindered or the land is unavailable for building purposes: |
|
Acres |
|
4. Subtract land that in a previously approved subdivision encompassing the same land, which as part or all of the subject parcel, was reserved for resource protection reasons (e.g., flooding): |
|
Acres |
|
5. Subtract land required for bufferyards pursuant to § 208-2202 and § 208-1507 of this chapter. Do not subtract bufferyard areas where they contain Resource Protection Land. To determine the amount of Resource Protection Land in the bufferyard, a similar Table as that in § 208-1705 shall be used. Column 3 shall be labeled "Acres of Resource Land in bufferyard and column 4 shall be labeled "Resource Protection Land in bufferyard. |
|
Acres |
|
6. Equals base site area: |
|
Acres |